Offshore Wind Offshore wind operator, Portugal

Locating a fault 135 m before a subsea joint.

Where TDR found nothing, LIRA® located a suspected subsea joint fault on a 6.8 km offshore cable, saving an estimated EUR 600,000.

The challenge

An offshore wind operator in Portugal suspected a fault in the subsea joints of a 6.8 km XLPE offshore cable. TDR did not identify the fault.

The approach

Wirescan used LIRA® to measure between phases, identifying the fault and locating it 135 m before the first subsea joint on the blue phase.

The outcome

  • An estimated saving of EUR 600,000, with less loss thanks to a targeted repair
  • Uncertainty about joint failure removed
  • Accurate fault location, plus overall knowledge of cable condition and points of concern
  • Less time on site, with fewer people and lower health and safety risks