Industrial Power
Reliance Industries
Turning a hidden 33kV cable risk into a targeted repair.
How LIRA® helped locate a hidden weak joint, avoid full cable replacement and restore a critical industrial cable asset.
Read case studyProven in the field
Real projects where LIRA® Technology revealed cable condition, located faults and gave operators the evidence to act. Each study covers the challenge, the approach and the outcome.
Industrial Power
Reliance Industries
How LIRA® helped locate a hidden weak joint, avoid full cable replacement and restore a critical industrial cable asset.
Read case study
Offshore Installation
Jan De Nul
How Wirescan technology supports real-time insight into cable condition during offshore handling and installation.
Read case study
Power Transmission
Transmission system operator, UK
LIRA® fingerprinted the full length of a 200 kV DC interconnector with 70 splices, where TDR and other methods could not.
Read case study
Power Transmission
Transmission system operator, Sweden
LIRA® located a fault on a damaged offshore cable to within 0.01% accuracy, saving an estimated EUR 600,000.
Read case study
Power Transmission
Transmission system operator, Norway
LIRA® located a short circuit on an 11.2 km, 420 kV cable system from 1981 and fingerprinted the remaining cables for future monitoring.
Read case study
Power Transmission
Transmission system operator, Norway
A LIRA® measurement found and located a high-severity fault on a 420 kV onshore cable, saving an estimated EUR 300,000.
Read case study
Offshore Installation
Cable installation company, Netherlands
LIRA® located an anomaly on a 220 kV offshore wind export cable after an abnormal bend during installation, saving an estimated EUR 600,000.
Read case study
Offshore Wind
TenneT Offshore GmbH
How Wirescan Digital supports grid cable condition analysis, trending and asset intelligence across offshore wind connections.
Read case study
Offshore Wind
Offshore wind operator, Portugal
Where TDR found nothing, LIRA® located a suspected subsea joint fault on a 6.8 km offshore cable, saving an estimated EUR 600,000.
Read case study